HORIZONTAL DIRECTIONAL DRILLS
HORIZONTAL DIRECTIONAL DRILLS
Jerry Piping Nigeria Limited / TOB- TECH Drilling Services Limited (Consortium)
Construction of 4”, 18” & 24” Gas pipeline, Forcados
Client: GIGAGAS
Contractor: JPNL
Contractor: JPNL
ESCRAVOS – LAGOS 36 “GAS PIPELINE AND RIVER CROSSING PROJECT-PHASE 11
Client: NNPC
Contractor: NNPC/ZAKHEM CONSTRUCTION NIG LTD
Sub-Contractor: JPNL
Contractor: NNPC/ZAKHEM CONSTRUCTION NIG LTD
Sub-Contractor: JPNL
24″ GAS PIPELINE FROM OB/OB TO OGBAINBIRI (REPLACEMENT OF DAMAGED SECTIONS)
Client: DEAWOO NIGERIA LIMITED.
Contractor: JPNL
Contractor: JPNL